Site assessment and field research

Illustration
  • 1. Environmental site assessment

    Initial investigation (Baseline screening) to identify potential environmental risks and historical land use:● Identify potential contaminants, assess soil quality, and evaluate the overall environmental condition of the site through the site visit and desktop study● Perform an in-depth analysis of historical land use practices in the project area by reviewing historical maps, land records, and archival data to identify any previous industrial activities, waste disposal practices, or other land uses that could have resulted in environmental contamination Preparation of a comprehensive report that outlines potential environmental hazards, contamination concerns, and any other risks identified during the investigation.
    Detailed investigation, including soil and groundwater sampling, to confirm the presence of environmental contaminants:●  Soil and groundwater sampling and analysis, identifying risks and required additional studies● Geophysical surveys and research (including baseline studies and desktop studies)● Conducting assessments to detect the existence of dangerous substances (or other elements following the scope of work).
    Assessment of the site's ecological value, including flora and fauna, to form conservation and mitigation measures:●  Identifying and documenting the diversity of plant and animal species present on the territory, using appropriate methods●  Identification and mapping of different habitat types (e.g. forests, wetlands, grasslands). Assessment of the quality and condition of each dwelling, taking into account factors such as vegetation structure, soil types and water availability Evaluating ecological significance of the site (based on international and national conventions, standards and instruments).

    Order the service

  • 2. Cultural heritage impact assessment

    ● Conducting an assessment of the potential impact on cultural heritage resources.Identifycultural heritage resources such as archaeological sites or historic buildings. Conducting consultations with stakeholders and heritage experts
    ● Assess potential risks, including physical impacts, visual changes, and potential disruptions to cultural practices
    Develop mitigating measures to protect cultural heritage that may include redesigning project elements to avoid or minimize impacts on cultural heritage sites, implementing protective measures, and establishing protocols for archaeological monitoring during construction

    Order the service

  • 3. Land acquisition and resettlement assessment

    ● Conduct a social impact assessment to understand the effects of land acquisition and resettlement on communities.
    ● Review local and international laws concerning land acquisition, resettlement, and the rights of affected communities
    Develop risk mitigation strategies and resettlement plans that may include designing measures to minimize negative impacts on affected communities, providing fair compensation, and ensuring that resettlement processes are conducted in a manner that upholds the well-being and rights of displaced individuals

    Order the service

  • 4. Water Footprint Assessment

    ● Conduct a baseline assessment of the organization's water footprint to analyze water consumption and usage across different aspects of the business, including manufacturing processes, supply chain activities, and facility operations
    ● Identify high-impact areas where water consumption is significant or where water-related risks are most pronounced by considering the organization's geographic locations, the availability of water resources, and the sensitivity of local ecosystems
    ● Collaborate with the client to develop water conservation and efficiency strategies (e.g. recommending technological upgrades, process optimizations, and water recycling initiatives)
    Provide guidance on integrating water footprint assessments into sustainability reporting frameworks and communicating findings to stakeholders

    Order the service

Illustration

Project with Zaporizhzhia City Municipality

Illustration

Mykolayiv Emergency Water Project

Illustration

Urban Transport Georgia

Illustration

Tbilisi Waste Treatment project

Illustration

Bakuriani Municipal Services project

Illustration

Tbilisi Metro Project and Tbilisi Bus Extension

Illustration

Conducting monitoring at MHP

Illustration

Nyva Pereyaslavshyny

Illustration

Edinstvo Group

Illustration

Elementum Energy

Illustration

Adsapience

Illustration

Nova Poshta

Illustration

Lviv Project

Illustration

Fozzy Group

Illustration

Ukrposhta

Illustration

TTC (Georgia)

Illustration

Trans-Oil

Illustration

URGENT Crisis response support, Ukraine

Illustration

Scatec Solar (LLC «BOHUSLAVENERGY")